Case Studies
You showed us your challenges, we showed you the change.
We go above and above to be the logistics partner you can rely on when seconds matter. Here are a few ways we have helped our clients gain better efficiency to take control of their bottom lines.
CASE STUDY 1
Who
No. 1 National Automotive Manufacturer
What
Inbound Cost
Up RM342K
Packing Cost
Down RM0.9mil
Truckload Efficiency
Up 25%
When
April 2006 – May 2009
How
Upon being appointed Lead Logistics Provider (LLP), we established a standard inbound transportation cost to reduce monthly inbound costs by RM342K. We then increased truckload efficiency from 40% to 65%. Finally, we made improvements to outbound CKD packing and established a standard outbound packing cost to save up to RM0.9mil in costs per month.
Who
No. 2 National Automotive Manufacturer
What
Truckload Efficiency
Up 20%
Reduced Trips
1,600 p.a
Savings
Over RM1 mil
When
July 2009 – January 2012
How
We rendered our expertise to raise in-plant logistics efficiency at the manufacturers’ multi vehicle factory. Our solutions improved the layout and process flow of 4 assembly lines resulting in one-way traffic flow and inventory reductions. We also ran 12 classroom sessions to train staff in Japanese automotive production efficiencies.
CASE STUDY 2
Who
No. 2 National Automotive Manufacturer
What
Inventory Savings
RM3 mil
Assembly Lines
4 down to 1
Efficiency Training
12 Sessions
When
July – December 2011
How
We rendered our expertise to raise in-plant logistics efficiency at the manufactures’ multi vehicle factory. Our solutions improved the layout and process flow of 4 assembly lines resulting in one-way traffic flow and inventory reductions. We also ran 12 classroom sessions to train staff in Japanese automotive production efficiencies.
Who
A Malaysian Automotive Vendor
What
Average Defects
Down 0.28%
Reject Ratio
Minimized
When
February – April 2012
How
JHC made improvements to the handling, transportation and racking of bumpers between the vendor and its client’s Shah Alam plant to minimize incidences of defects caused by logistics. Our solutions reduced incidences to zero within one month — bringing down average total defects caused by logistics per month to 0.42% from 0.70% the previous year.